Logo-FiskerForum
  • News
    • Latest News
    • Newbuildings
    • News Categories
      • News
      • Accidents – Shipwreck
      • Administration
      • Aquaculture
      • Associations
      • Economy
      • Education
      • End User – Food
      • Environment
      • Exhibitions
      • Fish Species
      • Fishing
      • Manufacturers
      • Story
      • Politics
      • Ports
      • Products
      • Regions
      • Research
      • Sponsored
      • Videos
    • News Service
    • News Archive
      • 2023
      • 2022
      • 2021
      • 2020
      • 2019
      • 2018
      • 2017
      • 2016
      • 2015
      • 2014
      • 2013
      • 2012
      • 2011
      • 2010
  • Vessels
    • Vessels
    • Recent Photos
    • Newbuild
    • Newbuild delivered
  • Service
    • Contact
    • Oil Prices
    • Auction Prices
    • Weather
    • News Service
    • Media Information
  • Industry Directory
  • Recent photos
Menu
  • News
    • Latest News
    • Newbuildings
    • News Categories
      • News
      • Accidents – Shipwreck
      • Administration
      • Aquaculture
      • Associations
      • Economy
      • Education
      • End User – Food
      • Environment
      • Exhibitions
      • Fish Species
      • Fishing
      • Manufacturers
      • Story
      • Politics
      • Ports
      • Products
      • Regions
      • Research
      • Sponsored
      • Videos
    • News Service
    • News Archive
      • 2023
      • 2022
      • 2021
      • 2020
      • 2019
      • 2018
      • 2017
      • 2016
      • 2015
      • 2014
      • 2013
      • 2012
      • 2011
      • 2010
  • Vessels
    • Vessels
    • Recent Photos
    • Newbuild
    • Newbuild delivered
  • Service
    • Contact
    • Oil Prices
    • Auction Prices
    • Weather
    • News Service
    • Media Information
  • Industry Directory
  • Recent photos
Aker BioMarine’s new trawler with its Optimar factory is scheduled to be delivered in November 2018 - @ Fiskerforum

Optimar factory for Aker BioMarine newbuild

  • May 10, 2017
  • FiskerForum
  • Dato: 10/05/2017
  • kl. 00:00
  • Kategori: Fishing
  • Tags: Krill
  • Land: Norway
Foto / Video: Optimar

ANNONCER

Optimar has signed a contract with Aker BioMarine to supply a complete krill factory for Aker BioMarine’s new krill vessel. The ship is being built by Vard and is scheduled for delivery by Vard Brattvåg in November of 2018.

The catch capacity of the vessel will be an impressive 1300 tonnes per day and it will have a processing capacity of 200 tonnes of meal per day. By way of comparison, the maximum catch capacity of the most efficient krill fishing vessel currently operating is 1000 tonnes per day. Optimar’s role will be that of systems integrator, and the company will have overall responsibility for the entire factory delivery.

According to Optimar, this is the first vessel to be built exclusively for krill production. Building a new, specially-designed krill fishing vessel offers a unique opportunity to apply new ideas at all stages of the process. Saving energy and reducing the operation’s environmental footprint were among the most important areas of focus when the new vessel was being planned.

Aker’s new krill trawler will be equipped with control systems from Optimar that allow the factory to be kept constantly at peak operating efficiency by means of continuous measurement and analysis. The vessel will be fitted with energy-saving equipment that reuses energy throughout the entire processing cycle. For example, heat from one part of the process will be reused elsewhere in the process. After boiling, the krill are decanted – solids and liquid having been separated – and the solids undergo further drying to produce krill meal. The factory has the capacity to produce 200 tonnes of meal a day.

Optimar is a longstanding collaborator with both Vard and Aker, and has supplied products and solutions to both companies.

On this project, Optimar worked closely with experts from Vard and Aker BioMarine over a period of several months to find the best solutions for the new vessel. Thorough analyses and calculations were performed on efficiency and energy-saving measures for the factory. The state-of-the-art facility will be equipped with the latest meal production equipment and a control system that offers an unparalleled level of control. Operating parameters will be logged continuously to maximise the quality and traceability of the product. All historical data can be processed to optimise operations in terms of quality and energy economy, and preventive service procedures can also be developed. The risk of downtime is reduced by remote servicing from on shore, with Aker BioMarine’s new control centre providing services 24/7.

The contract is worth in the region of NOK 300 million to Optimar, and it will consolidate the company’s position as a leading supplier to the fisheries industry.

Besøg os på
Seneste Nybygninger

New Cleopatra 36 for Lofoten fisherman

Christian í Grótinum delivered to Klaksvík owners

New factory trawler for Icelandic owners

Orion BF-432, latest Macduff newbuild

PrevForrige nyhedNodosa delivers Henk Senior
Næste nyhedBreakthrough year for CarsoeNext

Snow delays end of capelin season

Furious fishermen blockade Boulogne

Ten years conservation haven’t brought fish back

Encouraging a new generation of shipbuilders

ANNONCER

Contact info

  • +45 60 22 09 46
  • info@fiskerforum.com
  • Otto Pedersvej 1
    6960 Hvide Sande
    Denmark

News

  • Latest News
  • Newbuildings
  • News Service
  • Know anything?
  • News in Danish

Service

  • Vessels
  • Classifieds (coming)
  • Jobs (coming)
  • Oil Prices
  • Auction Prices
  • Media Information

News Archive

  • 2019
  • 2018
  • 2017
  • 2016
  • 2015

News Service

Facebook-f Twitter Youtube
Logo-FiskerForum

All pictures, texts and data on FiskerForum are protected by Danish copyright law. All rights belong or are handled by FiskerForum.com on behalf of the associated photographers. It is not allowed to copy or use texts, data or pictures from FiskerForum without permission. © 2004 - 2019

Made with love by ApolloMedia

Terms and conditions Cookie & Privacy Policy

By continuing to use this website, you consent to the use of cookies in accordance with our Cookie Policy.

Accept